Maytag 111405-1 Service Manual Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 78
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
23 16021730 Rev. 0
Slide Rail
Mounting Screw
COMPRESSOR REPLACEMENT
1. Turn the main power switch in the machine
compartment to the off position
Evacuate the sealed system.
2. Remove the high side slide rail mounting screw.
3. Slide the high side foward into the service position.
4. Clean and cut the refrigerant lines as close as
possible to the compressor stubs, leaving enough
length to install the replacement compressor.
NOTE: A new drier must be installed each time any
component of the system is opened or
replaced.
Cut Here
Cut Here
5. Disconnect lead wires from compressor
terminals.
6. Remove the bolts from the compressor mounts.
Remove defective compressor from cabinet and
install rubber grommets on replacement
compressor.
7. Clean the compressor stubs with an abrasive
cloth such as grit cloth No. 23. Do not open the
compressor stubs.
8. Install the replacement compressor using the
mounting bolts previously removed.
9. Connect the compressor leads.
10.Transfer the process tube from the old
compressor. Connect the refrigerant tubing to
the compressor stubs using silfos on copper to
copper joints and silver solder and flux on steel
to copper joints.
11. Locate and remove old drier. Install new drier.
The new driver is installed in the following
manner:
a. Carefully bend the old drier and tubing away
from electrical parts.
b. Use steel wool or fine emery paper to clean
the capillary tube 3 inches from the original
joint. Also, clean the input tubing to the drier
of 3 inches from the original joint.
c. Use steel wool or fine emery paper to clean
both ends of the new drier. Use a knife or file
to score the capillary tube 1 inch from the
original joint. Use your finger to break the
connection.
d. Make an offset 1/2" from the end of the cap
tube to prevent it from penetrating too far into
the drier.
e. Cut the inlet tube of the replacement drier and
use pliers to snap off the scored end. Transfer
the process line to the new drier.
f. Install the new drier using silfos yoder tube
and the drier to compressor.
NOTE: The holding charge is your assurance that
the new compressor is dry and ready to
install. If you receive a replacement
compressor that shows no evidence of
holding charge when you remove the plugs,
return it.
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 77 78

Comments to this Manuals

No comments