Maytag FLOOR-2-FLOOR Technical Information Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
14 INSTALLATION INSTRUCTIONS PUBLICATION DATE Nov 05 516828
Fig.6 Sag in front of cable passing and incoming supply terminal
Provide a sag in the cable, in front of the cable strain relief. This will avoid ingress of condensed water into
the machine, see picture.
8.3. LOAD ON ELECTRICAL SUPPLY NETWORK
When multiple machines are connected to the same electrical network, it is necessary to connect the
machines according to Fig. below. The 2 wires of the machine that feeds the frequency control of the
machines has to be connected alternatively for the phase wire L1 and L2 of the network, the second machine
with the L2 and L3 of the network, the third machine with the L3 and L1 of the network. The fourth machine
must again be connected to the first phase L1 and L2 etc... This assures a better load division of the
electrical network.
Fig 7
Page view 13